My first task is to delete all windows and doors and replace them with openings.
Revit replace window with door phasing.
To access all phases options go to phases menu in the manage tab.
The existing windows the destruction plan with the existing windows in red the project plan with the new windows the problem is.
Wanting to know how to control the display of elements based on their phase status in revit.
There are hundres of windows and doors in the model and if i just delete the door or window the opening disappears with it.
For most project this is all you will need.
The wall infill s the demolished window and then when new window of same size location is added it confuses the model.
If you place an insert into a host in a phase later than the host s creation phase revit lt creates an infill element for earlier phases.
Get the highest quality bim content you need from the manufacturers you trust.
The phase property of the inserts door or window opening can differ from the walls phase.
You look at the roof and skylight in a 3d view.
We are trying to find the quickest way to replace windows in a renovation project.
So now i ve got a model from an architect company that i need to edit.
Need to know correct workflow for managing phasing.
A phase filter is a rule that allow to apply a view to control the display of elements based on their phase status.
1 create all necessary phases.
We would like to have the plans of.
By nature revit infill s the demo phase but the infill itself doesn t have a phase assigned.
In most revit templates the basic phases are existing and new.
If different phase property values are assigned to host and insert an infill element will be created.
This cannot be deleted or edited separately for changing phase property value.
The first thing you need to do is set the phases you require.
Infill elements for earlier phases.
You add a skylight to the roof in phase 2.
For example you create a roof in phase 1.
A common mistake is to create a demolition phase.
Download window revit families for free with bimsmith.
In the projet the idea is to demolish the existing windows keep the hole and place a new window on the outside of the wall.
Element was created in the phase of the current view.